Skip to main content

About your Search

20121201
20121231
STATION
SFGTV 3
SFGTV2 1
LANGUAGE
Search Results 0 to 3 of about 4 (some duplicates have been removed)
SFGTV
Dec 12, 2012 4:00pm PST
dpw and cal train committed to incorporate landscaping to enhance both those projects. lastly, we have heard consistently from the community, the importance of incorporating a local job opportunities and contracting opportunities and so this funding request includes a request for developing an outreach strategy to go out and engage folks in the community so they can participate in the opportunities that will be available with both of these projects. given the work we've done and the community outreach, we are essentially, i think we kind of presented this conclusion or rather thinking on it initially but further work has essentially found that the option one, the berm option combined with the connector road really are not ideal are the best options we have in terms of maintaining that bridge with the funds we have in terms of facilitating a station and maintaining local access. and in terms of facilitating other land use activities in the area. those include the pc but go into a little more detail. we also included in this package of improvement and city project for the connector road
SFGTV2
Dec 4, 2012 11:00am PST
is to provide funding for the next phase of connector road design. that includes allocating prop k funds to dpw which will be leading the 30% design effort for the connector road. that includes environmental review as well as starting right at negotiation. the purpose of that is to get more clarity to the schedule and make sure the connector road can move forward in parallel with the bridge replacement project. really make sure we're minimizing that construction overlap period. lastly to appropriate prop k funds to the authority to continue working on planning and project oversight as well as conducting further rounds of outreach to go into the community with the work that we're going to be doing and providing some answers to the community in the spring before we come back to the board. finally that authority piece does include that local business robust outreach strategy to make sure people are aware of and can participate in those contracting opportunities. we'll come back to the community and back to the board in the spring with remaining questions in terms of design, schedule and what the
SFGTV
Dec 9, 2012 6:30am PST
presented now. dpw initial application for this project included repaving work on 9th street and brian to 8th to 11th. dpw staff informed us the brian street segment will need two repairs. the schedule for this work is to be determined and dpw staff anticipate funding this segment with future gas tax, prop k or other available funding. we've kept the full amount program at dpw request. next is dolores. the draft we did bring you to in december. the project, dpw submitted dolores street pavement that project includes pedestrian enhancement. scheduled for construction in the fiscal year '14 and '15. there wasn't enough -- after funding higher ranking project, there weren't enough prop double a funds to fund all the eligible projects. the condition associate with this action, the condition which has been agreed to by dpw to fund the long street project unless dpw secures other funds. district six, safety projects. we recommended funding for two pet safety projects located in district six. one is mid clock crossing. it was identified in the neighborhood transportation plan. several of the trea
Search Results 0 to 3 of about 4 (some duplicates have been removed)